Chronological experimental logs grouped by year.

2026
2025
  • 2025-06 - Soil-steel composite bridge, Sodra Orsjo
    Measured acceleration during train passages and impact hammer tests.
  • 2025-06 - Soil-steel composite bridge, Harestorp
    Measured acceleration during train passages and impact hammer tests.
  • 2025-06 - VP NSP/USP bridges, Strangsjo
    Slab bridge and portal frame bridge, long-term monitoring system with 4 strain gauges and 6 accelerometers.
2024
  • 2024-12 - Bro over Hatunaviken vid Erikssund, Sigtuna
    Dynamic testing using an impact hammer and passing cars.
  • 2024-11 - Shake-table test, Berlin
    Dynamic testing of ballast. Part of InBridge4EU/WP5, coordinated by Dr.-Ing. Matthias Baessler.
  • 2024-09 - Trough bridge, Lulea
    Dynamic testing using an impact hammer and a hydraulic actuator.
  • 2024-06 - Noise barrier, Norrviken
    Dynamic testing using an impact hammer.
  • 2024-06 - Footbridge at Fysikcentrum, Stockholm
    Dynamic tests with walking pedestrians.
2023
  • 2023-12 - Trough bridge, Lulea
    Dynamic testing using an impact hammer.
  • 2023-10 - VP NSP/USP bridges, Strangsjo
    Slab bridge and portal frame bridge, impact hammer tests and dynamic response from passing trains using a trigger system.
  • 2023-07 - Bro over Bjornnasvagen, Roslagsbanan
    Portal frame bridge, impact hammer tests and dynamic response from passing trains using a trigger system.
  • 2023-03 - Footbridge at Tinnerbacken, Linkoping
    Vibration testing during construction of a timber footbridge.
2021
  • 2021-09 - Vibratory plate compaction, Alvnas Ekero
    Dynamic testing of vibro-compactor and dynamic measurements for SASW.
  • 2021-08 - Footbridge at Brumunda, Hamar Norway
    In-service vibration testing of a timber footbridge.
  • 2021-08 - Footbridge Stela Bru, Hamar Norway
    Vibration testing during construction of a timber footbridge.
  • 2021-06 - Steel-concrete composite bridge, Bryngean
    Measured acceleration during train passages and forced vibration tests, with and without external viscous dampers. Installation of long-term monitoring system.
2020
  • 2020-09 - Steel-concrete composite bridge, Bryngean
    Measured acceleration during train passages and forced vibration tests, with and without external viscous dampers.
  • 2020-06 - Portal frame bridge, Norra Kungsvagen
    Measured acceleration during train passages and forced vibration tests.
  • 2020-06 - Portal frame bridge, Sodra Kungsvagen
    Measured acceleration during train passages and forced vibration tests.
  • 2020-06 - Continuous concrete bridge, Sidensjovagen
    Measured acceleration during train passages and forced vibration tests.
  • 2020-06 - Steel-concrete composite bridge, Bryngean
    Measured acceleration during train passages and forced vibration tests.
  • 2020-06 - Steel-concrete composite bridge, Banafjalsan
    Measured acceleration during train passages and forced vibration tests.
2019
  • 2019-06 - Simply supported concrete bridge, Hasthovsgatan Vasteras
    Measured acceleration during train passages and forced vibration tests.
  • 2019-06 - Footbridge at Fysikcentrum, Stockholm
    Dynamic tests with walking pedestrians.
  • 2019-06 - Continuous concrete bridge, Vasavagen Eskilstuna
    Measured acceleration during train passages and forced vibration tests.
  • 2019-06 - Continuous concrete bridge, Sveavagen Eskilstuna
    Measured acceleration during train passages and forced vibration tests.
  • 2019-06 - Continuous concrete bridge, Taxinge Mariefred
    Measured acceleration during train passages and forced vibration tests.
  • 2019-05 - Enkopingsvagen bridge, Balsta
    Measured acceleration during train passages and forced vibration tests.
  • 2019-05 - Portal frame bridge, Gesallgatan Enkoping
    Measured acceleration during train passages and forced vibration tests.
  • 2019-05 - Continuous concrete bridge, Fanna Enkoping
    Measured acceleration during train passages and forced vibration tests.
  • 2019-05 - Continuous concrete bridge, Bodavagen Enkoping
    Measured acceleration during train passages and forced vibration tests.
2018
  • 2018-09 - Soil-steel composite bridge, Harestorp
    Measured strain, displacement and acceleration during train passages and forced vibration tests.
  • 2018-09 - Soil-steel composite bridge, Sodra Orsjo
    Measured strain, displacement and acceleration during train passages and forced vibration tests.
2017
  • 2017-09 - Soil-steel composite bridge, Marsta
    Measured strain, displacement and acceleration during train passages and forced vibration tests.
  • 2017-02 - Footbridge, Barkarby
    Dynamic tests with pedestrians.
2016
  • 2016-06 - Hollow core slab deck, Norrtalje
    Dynamic tests at Contiga Norrtalje.
2015
  • 2015-10 - Portal frame railway bridge, Faresmyran
    Full-scale dynamic tests using a hydraulic bridge exciter.
  • 2015-10 - Portal frame railway bridge, Degermyran
    Full-scale dynamic tests using a hydraulic bridge exciter.
  • 2015-09 - Footbridge, Barkarby
    Dynamic tests with walking pedestrians.
  • 2015-09 - Concrete railway bridge, Aspan
    Full-scale dynamic tests using a hydraulic bridge exciter.
  • 2015-06 - Concrete railway bridge, Pershagen
    Full-scale dynamic tests using a hydraulic bridge exciter.
  • 2015-06 - Footbridge at Fysikcentrum, Stockholm
    Dynamic tests with walking pedestrians.
2014
  • 2014-06 - Concrete slabs with shotcrete, Sweden
    Static (ULS) and dynamic (impact) load tests.
2013
  • 2013-08 - Steel truss bridge, Aby alv
    Dynamic full-scale testing using a rotating mass exciter.
2012
  • 2012-11 - Tied-arch railway bridge, Ljungan vid Alby
    Measured strain and acceleration of hangers. Full-scale test of a TMD-system.
  • 2012-09 - Bi-directional multi-passive tuned mass damper, Dublin
    Experimental testing at Trinity College Dublin Ireland.
2011
  • 2011-06 - Footbridge at Fysikcentrum, Stockholm
    Dynamic tests with walking pedestrians.
  • 2011-05 - Steel grillage railway bridge, Soderstrom Bridge
    Strain measurements for fatigue assessment (hot-spot method), before and after geometric improvement.
2010
  • 2010-12 - Steel grillage railway bridge, Soderstrom Bridge
    Strain measurements for fatigue assessment setup II.
  • 2010-05 - Soil-steel composite bridge, Marsta
    Measured strain, displacement and acceleration during train passages.
2009
  • 2009-12 - Soil-steel composite bridge, Marsta
    Measured strain, displacement and acceleration during train passages.
2008
  • 2008-08 - Steel grillage railway bridge, Soderstrom Bridge
    Strain measurements for fatigue assessment setup I.
2007
  • 2007-12 - Railway tunnel, Strangnas railway tunnel
    Measured air-pressure from passing trains and vibrations on an emergency door.
2006
  • 2006-10 - Footbridge at Fysikcentrum, Stockholm
    Dynamic tests with walking pedestrians.
  • 2006-07 - Two railway bridges, Tidan and Osan
    Measured acceleration and end-rotations during high-speed train passages (Grona Taget).
  • 2006-03 - Suspension bridge, Alvsborg Bridge
    Vibration measurements including detailed measurements of hangers.
2005
  • 2005-2011 - Concrete arch bridge with backfill, Old Arsta railway Bridge
    Strain measurements in 25 setups for model calibration and verification before, during and after strengthening.
  • 2005-10 - Suspension bridge, Alvsborg Bridge
    Vibration measurements to determine dynamic performance and cable forces.
  • 2005-05 - Concrete arch bridge, Svinesund Bridge
    Load testing.
2003
  • 2003-06 - Tied-arch railway bridge, Ljungan vid Alby
    Measured strain and acceleration of hangers.